  • Make sure you select the correct temperature specific to the weather.
  • In order to obtain best results, it's advisable to carry out experiment at first.
  • When using CRACKAG with highly absorbent materials like concrete, the holes should be dampened before the mortar is poured, making sure however, that there is no presence of water.
  • Large diameter holes positioned closer together accelerate breaking times.
  • Make sure the holes are clean and no water and residues left in the holes, or use high-pressure air hose to clean out.
  • Fresh mortar should be poured into holes within 5 minutes after mixing.
  • Do not mix more than 2 bags ( 10 kg ) for each lot at a time.
  • The feeding depth should be 100% of the pre-drilled holes.
  • The workers need to take synchronized operation, especially to hard stone. The quantity of holes each worker responsible to fill has to be moderate. Taking synchronized steps when mixing, stirring and filling will lead to maximum expansive stress with all holes expand at the same time.
  • Never use glass or metal containers for mixing.
  • When mixing, if CRACKAG begins to steam in container, add some water to dilute and process properly.
  • Cover holes to avoid direct sunlight. Example a tarp to provide shade or wet hay.
 